Guide Part 3
     
Home Page

U-Make Module List

Guide Part 1

Guide Part 2

Guide Part 3

Screenshots

 

 


 

Buildings/Structures

Again just go nuts, make whatever you want. Just be considerate of frame rates. Try to keep to one or two areas of operation to each module as this gives the chance to build bigger routes using the modules. As for foliage, just don’t use anything that is going to eat up slower machines, or if you have to please say so in the description.

Finishing Touches

Don’t forget cameras where you want them and signaling where appropriate. I’m not imposing and specifics regarding signaling just try to make sure it all works. I’ll also add here tips for making routes truly finished.

 

1: Name ALL junctions even if the name is generic it makes a difference.

2: Fences make a big difference to industrial or commercial areas, try to use them.

3: Power lines, same reason as #2.

4: Name some buildings so they appear on the mini-map screen.

5: Static vehicles in appropriate places.

6: Set junctions to run straight through, to stop derailments.

Packaging

Please include a detailed description of your module as well as a U-Make note either in the title or at the start of the description. Also please say if you have included payware and where to get that payware from. If you plan to include content not hosted on the DLS then please include both a link to the site it is from and YOUR e-mail address so as to avoid problems. Also please give credit where due, especially if modifying another module.

 

Also note that ANY U-make module may be reused in others routes as long as they are hosted freely on the DLS and credit is given to the original creator. This is not negotiable in any form. By submitting a route that fits these U-Make guidelines then you agree to the above statement.

 

 

Eso